2015年8月31日星期一

Invitation to Attend the PTC ASIA 2015 Exhibition Letter from DENAIR AIR COMPRESSOR

Dear friends,

It gives us great pleasure to invite you to the PTC ASIA 2015, to be held in 27th-30th Oct 2015.

DENAIR is a manufacturer specialized in air compressor,including Oil-injected Double Screw Air Compressor, Oil Free Air Compressor, Permanent Magnet Variable Frequency Air Compressor, portable air compressor,High Pressure Air Compressor, Compressed Air Treatment Equipment.

This exhibition will surely benefit the visitors who are in the line of air compressor.

Event: Power Transmission and Control 2015
Exhibition Center: Shanghai New International Expo Center (SNIEC)
Address: No. 2345 Longyang Road,Pudong New Area, Shanghai 201204, P. R. China
DENAIR Booth Number: H4,Hall N1.
Date: 27th to 30th Oct 2015

We will be pleased to see your presence in the exhibition.

Yours sincerely,

Shanghai Denair Compressor Co., Ltd.






2015年8月30日星期日

The eighth part of portable air compressor project implementation schedule

  The eighth part of portable air compressor project implementation schedule

  The progress of the project implementation period arrangement is an important component part of the feasibility study report. Also called investment project implementation period time, it is to point to from formal to determine the construction project to project to the normal production during this period, this period including project preparation, funding arrangement, survey and design and equipment ordering, construction preparation, construction and production preparation, test run until completion inspection and acceptance and delivery and so on each work phase. These stages of investment activities, and each work link, some are influence each other, more closely with front and rear, there are also carried out at the same time, the cross each other. In feasibility study stage, therefore, the work link of the project implementation period for each phase must be unified planning, overall balance, make reasonable and feasible.

  A, portable air compressor the stages of project implementation

  (a) to establish project management institutions

  (2) the funding arrangements

  (3) and transfer of technology

  (4) the survey and design and equipment orders

  (5) the construction preparation

  (6) of construction and production preparation

  (7) the completion acceptance

  Second, the portable air compressor project implementation schedule

  Three, portable air compressor project implementation costs

  (a) the construction unit management fees

  (2) the production preparation fee

  (3) the production staff training

  (4) office furniture purchase expense and life

  (5) other expenditures

The seventh part of portable air compressor project organization and labor capacity

  The seventh part of portable air compressor project organization and labor capacity

  In the feasibility study report, according to the project scale, composition and process flow, study and put forward the corresponding enterprise organizations, the total amount of labor capacity and labor source and relevant personnel training plan.

  A project organization, portable air compressor

  (1) organizational form

  (2) working system

  Second, the portable air compressor project labor capacity and personnel training

  (一) labor capacity

  (二) annual total wages and worker average wage estimates

  (三) the personnel training and cost estimation

The sixth part of the portable air compressor project environmental protection, energy saving and labor safety

  The sixth part of the portable  air compressor project environmental protection, energy saving and labor safety

  In project construction, it is necessary to carry out relevant national environmental protection, energy saving and occupational safety regulations and laws, the project may cause the surrounding environmental impact or worker health and safety factors, must carry on the demonstration analysis in the feasibility study phase, puts forward prevention measures, and to evaluate its recommendation technology is feasible, economic, and rational layout, the best way to less harmful effects to the environment. According to the existing provisions of the state, who engaged in the environmental impact of construction projects must be the implementation of the environmental impact report for examination and approval system, at the same time, in the feasibility study report, the environmental protection and labor safety to be specifically discussed.

  A project of environmental protection, portable air compressor

  (a) project environment protection design basis

  (2) project environmental protection measures

  (3) the project environmental assessment

  Second, the portable air compressor project resource utilization and energy consumption analysis

  (a) project resource utilization and energy consumption standards

  (2) the project resource utilization and energy consumption analysis

  Three projects, mobile air compressor energy saving scheme

  (a) project energy saving design basis

  (2) the project energy saving analysis

  Four fire scheme, portable air compressor project

  (a) fire protection design basis

  (2) project fire protection measures

  (3) the fire alarm system

  (4) fire extinguishing system

  (5) fire control knowledge education

  Five, the portable air compressor project occupational safety and health plan

  (a) project labor safety design basis

  (2) the project labor safety and protective measures

The fifth part portable air compressor project construction and civil general rules

  The fifth part portable air compressor project construction and civil general rules

  A project construction, mobile air compressor

  (a) portable air compressor project construction location

  (2) portable air compressor project construction to natural conditions

  (3) portable air compressor project construction land resources

  (4) portable air compressor project construction to the economy

  (5) portable air compressor project construction to the population

  Second, the portable air compressor project civil general rules

  (a) the project construction site and facility

  1, the site of factory

  2, plant construction content

  3, plant construction cost

  (2) civil engineering general layout

  1, the layout. List the names of the main single items of projects as a project, production capacity, the size of the area, shape, process sequence and layout.

  2, vertical layout

  (1) the site terrain conditions

  (2) vertical layout scheme

  (3) the ground elevation and the quantity of construction conditions

  3, technical renovation project of the original building and structures

  4, general layout, technical renovation projects should clearly indicate the new and original and the position of the demolition of the building and structures of)

  Table 5, general layout, main index

  (3) the gestures

  1, traffic and transportation way outside

  2, based on the traffic and transportation mode

  3, internal transport facilities and equipment

  (4) project construction and related engineering

  1, the project covers an area of

  2, project construction and related engineering content

  (5) project construction and related engineering cost

  (6) other aided engineering project

  1, the water supply project

  2, power engineering,

  3, heating engineering

  4, communication engineering,

  5, other

The fourth part mobile air compressor product planning project

  The fourth part portable air compressor product planning project

  A project products, portable air compressor capacity planning

  Second, the portable air compressor project product process planning scheme

  (a) process equipment selection

  (2) process

  (3) process

  Three projects, portable air compressor products marketing planning scheme

  (a) marketing strategy planning

  (2) marketing model

  In the commodity economy environment, the enterprise according to the market situation, to develop qualified sales model, to expand market share, stable sales prices, improve product competitive ability. Therefore, in the feasibility study report, to make a detailed study of marketing mode.

  1, the investors are divided into

  2, enterprise self locking

  3, the national part of the acquisition

  4, distributor on a commission basis and on a commission basis situation analysis

  (3) the promotion strategy

The third part of portable air compressor project products market analysis

  The third part of portable air compressor project products market analysis

  Market analysis in the important position in the feasibility study is that any one project, the determination of production scale, technology choice, the choice of investment estimation and the site of factory, must be will have a full understanding of market demand situation to decide. And market analysis, still can determine the price of the product, sales income, ultimately affect the profitability and feasibility of the project. In the feasibility study report, detailed study of the current market situation, as the basis of a late decision.

  A mesh products market research, portable air compressor

  (a)portable air compressor products international market research project

  (2) portable air compressor products in domestic market research project

  (3) portable air compressor project product price investigation

  (4) portable air compressor product upstream raw material market research project

  (5) mobile air compressor products downstream consumer market research project

  (6) mobile air compressor project products competition in the market survey

  Second, the mobile air compressor project products market forecast

  Market forecast is the continuation of market research in time and space, using the information got by the market research data, this item product in the future market demand and related factors in quantitative and qualitative judgment and analysis, to obtain market forecast. Working in the feasibility study report, the market forecast conclusion is to develop product solutions, important according to the size reference for the construction project.

  (a) portable air compressor project products international market forecast

  (2) mobile air compressor project products in the domestic market forecast

  (3) portable air compressor item product price forecasting

  (4) portable air compressor project products upstream raw material market forecast

  (5) portable air compressor project products downstream consumer market forecast

  (6) portable air compressor project development prospect were reviewed

The portable air compressor project feasibility study report directory

  The portable air compressor project feasibility study report directory

  The first part of the project general portable air compressor

  General as the first part of the feasibility study report, the main parts of the comprehensive narrative study problems and the research conclusion, and puts forward final recommendations of the project is feasible or not, provide convenience for the feasibility study of examination and approval.

  The project background, portable air compressor

  (a) the project name

  (2) the project undertaking unit

  (3) the feasibility study for the unit

  (4) project, the director of the department

  (5) project construction content and scale, the goal

  (6) project construction site

  Second, the project feasibility research main conclusion

  In feasibility study of project product sales, raw material supply, policy support, technical scheme, the total amount of money raising, project finance and national economic and social benefits and other major issues, should be a clear conclusion, mainly includes:

  (a) item product market prospect

  (2) project raw material supply problem

  (3) the project policy security problems

  (4) project funding problems

  (5) project organization security problems

  Technical support (6) project

  (7) project of human security

  (8) project risk control problem

  (9) project financial benefits

  Conclusion
  (10) project social benefits

  (11) project feasibility evaluation

  Third, main technical and economic indicators table

  In the general part, can study in all parts of the main technical economic indicators, lists the main technical and economic indicators table, make the examination and approval and decision makers to understand project as a whole.

  Fourth, problems and Suggestions

  On the feasibility study of project show the main problems and puts forward the Suggestions.

Portable air compressor project feasibility study report

The project feasibility study report portable air compressor content 
The first part                project summary
The second part          demand forecasting and proposed scale
The third part               resources, raw materials, fuel, and public facilities
The fourth part             design
The fifth part                 factory and site plan
The sixth part               the environmental protection
The seventh part          the enterprise organization, labor capacity and personnel training (estimate)
The eighth part             implementation schedule proposal
The ninth part               capital raising and investment estimation
The tenth part               the social and economic effect evaluation
The eleventh part         of the feasibility study conclusions and recommendations